Christmas
and New Year break is now well behind us and the rate of the fitting
out is back at full pace. If I miss a couple of days visiting the
boatyard I have missed the opportunity for particular photographs.
In the following images you will see that all the ceiling cladding
is in place, along with all the lower cladding panels.
|
 |
| The
joints between the panels will be capped with hardwood strips at the
finishing stages.
|
 |
| The
lower cable runs are now covered by the cladding and the necessary
cables for later fitting to appliances and controls have been passed
through the panels at the appropriate points. |
 |
|
 |
| A
picture of the ceiling cladding surrounding the roof skylight, with
the picture below showing a close up of the foam insulation between
the steel roof and the ceiling panel. |
 |
And
yes, that is rain on the top of the skylight, it has been a quite
wet in Stoke Golding just lately, and likely to be getting wetter.
The good news is Measham is now fully weather proof. |
 |
 |
The bulk
of the pipework for both the fresh water system and the central
heating system has now been installed.
The connections to actual appliances in the kitchen and bathroom,
the central heating boiler, radiators, engine calorifier, etc. will take place
later on during the fit-out.
Only then will the pipes be "boxed in". |
 |
The cables
now fitted but waiting to be connected to power sources, the control
box and appropriate controls.
The ceiling cable ducts will be capped later, in the finishing
stages of the fit-out. |
 |
The gas
pipe now being fitted to supply gas to the central heating boiler,
cooker and refridgerator. |