 |
The
painting continues and we can see that left hand side of the boat,
looking from the back is now up to finished top coat.
Various other parts of the company "livery" are
undercoated ready to receive first and finished top coats of gloss
paint. |
 |
|
 |
|
 |
The
right hand side of the boat observed from the back, to the left as
we look at the image, is the lightly sanded first top coat waiting
for the final top coat of gloss. |
 |
|
Looking
to the rear of the boat.
Interior "battening" is now almost complete.
The interior paneling and all other fixtures will be fixed directly
or indirectly to the wooden battening, very very few items are fixed
directly to the steel of the hull.
Port hole surrounds, and porthole "trims" can be seen at
the side of the boat ready for fitting. |
 |
|
 |
Roof
battening ready to take the roof panels.
But before any interior paneling, roof or sides, takes place the
interior, between the battens, will be insulated with sprayed polyurethane
foam. |
 |
| Looking
to the front of the boat. |
 |
| Note
the white plastic ducting already fitted to the side of the
roof to enclose the electrical wiring. |
 |
| White
plastic ducting being fitted to both sides of the boat. |
 |
Return to Measham ---> Main
Diary Page
|